In construction, a floor void is typically a vertical opening or hole that is left in the floor construction either to accommodate services, or allow the installation of a staircase or, as an aesthetic feature.
When services such as pipework, ducts and cables are required to penetrate vertically through a floor construction, a void must be created at the time of construction otherwise costly and disruptive remedial work must be undertaken. To avoid this, architects and engineers usually delineate on their drawings where floor voids are to be located.
With in-situ-poured concrete floors, voids need to be trimmed (with appropriate reinforcement within the floor thickness) around the opening and the necessary formwork installed to create the size and shape of void required. When the concrete is poured and the formwork eventually removed, a void remains.
Small vertical holes can be formed not only by timber boxes, which are usually removed after casting, but also by other materials such as polystyrene and stiff cardboard, which may be left in position.
Sometimes, when no provision for a void has been made, and the concrete has been poured, it is possible (for small service voids), to cut the holes after the concrete is cast. However, this is uneconomical and disruptive.
With precast concrete planks and beams, depending on the size of the void, special factory-made units can incorporate a hole in the beam or plank; alternatively, for larger voids, a system of shorter planks and mild steel supporting straps or trimming beams can be used to ‘trim’ around the edge of the void.
It is generally regarded as good practice not to locate voids too close to columns and beams.
Larger voids within floors can be left for architectural reasons, eg to allow a visual link between two floors, as might be used in a reception area or atrium to open-up the space.
The term floor void can also be used to refer to the horizontal space between a ceiling and the floor above, which may accommodate the floor structure, services and so on. It may also refer to the void between the bottom floor of a building and the ground below, sometimes referred to as a crawl space.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.