Floor void
In construction, a floor void is typically a vertical opening or hole that is left in the floor construction either to accommodate services, or allow the installation of a staircase or, as an aesthetic feature.
When services such as pipework, ducts and cables are required to penetrate vertically through a floor construction, a void must be created at the time of construction otherwise costly and disruptive remedial work must be undertaken. To avoid this, architects and engineers usually delineate on their drawings where floor voids are to be located.
With in-situ-poured concrete floors, voids need to be trimmed (with appropriate reinforcement within the floor thickness) around the opening and the necessary formwork installed to create the size and shape of void required. When the concrete is poured and the formwork eventually removed, a void remains.
Small vertical holes can be formed not only by timber boxes, which are usually removed after casting, but also by other materials such as polystyrene and stiff cardboard, which may be left in position.
Sometimes, when no provision for a void has been made, and the concrete has been poured, it is possible (for small service voids), to cut the holes after the concrete is cast. However, this is uneconomical and disruptive.
With precast concrete planks and beams, depending on the size of the void, special factory-made units can incorporate a hole in the beam or plank; alternatively, for larger voids, a system of shorter planks and mild steel supporting straps or trimming beams can be used to ‘trim’ around the edge of the void.
It is generally regarded as good practice not to locate voids too close to columns and beams.
Larger voids within floors can be left for architectural reasons, eg to allow a visual link between two floors, as might be used in a reception area or atrium to open-up the space.
The term floor void can also be used to refer to the horizontal space between a ceiling and the floor above, which may accommodate the floor structure, services and so on. It may also refer to the void between the bottom floor of a building and the ground below, sometimes referred to as a crawl space.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.